Assumption Regional Catholic School

Location Galloway Township NJ
Client Church of the Assumption, Diocese of Camden
Architect Manders/Merighi Associates
Start Date September 2006
Completion Date August 2007
Building Size 60,000 sq. ft.
Construction Butler® Metal Building / Conventional
Special Characteristics
and Challenges
The gym construction was a Butler Building with Koreteck paneling on the exterior covered with an EIFS finish. This portion of the building included the gymnasium, cafeteria and kitchen. The main classrooms were conventional load bearing construction with metal truss roof system. Both were integrated into a school with the capacity of 500 students.

 

"Stanker & Galetto is still the finest general contractor I have worked with in over 40 years as a architect.   
                                  - Art Basciano, Architect for the Diocese of Camden

   