| Location |
Galloway Township NJ |
| Client |
Church of the Assumption, Diocese of Camden |
| Architect |
Manders/Merighi Associates |
| Start Date |
September 2006 |
| Completion Date |
August 2007 |
| Building Size |
60,000 sq. ft. |
| Construction |
Butler® Metal Building / Conventional |
Special Characteristics and Challenges |
The gym construction was a Butler Building with Koreteck paneling on the exterior covered with an EIFS finish. This portion of the building included the gymnasium, cafeteria and kitchen. The main classrooms were conventional load bearing construction with metal truss roof system. Both were integrated into a school with the capacity of 500 students.
|
"Stanker & Galetto is still the finest general contractor I have worked with in over 40 years as a architect. - Art Basciano, Architect for the Diocese of Camden
|
| |
|
| >Back to Projects |
|